Take alternative routes on June 30, 2022
Plan your routes, take alternate routes
MMDA says the closure from April 22 to 24 is to give way to travel and tourism event, political rally
MMDA will repair the long-overdue drainage problem at the Libertad portion of Roxas BLVD
Habagat resulted in the closure of 7 major roads in north Luzon. The DPWH is working to clear them as soon as possible.
NLEX to close 3-kilometer Manila-bound section of Candaba viaduct for repairs.
Expect single lane closures along CAVITEX near Zapote to Longos entry up to May 3, 2021.
DPWH Region 4A has closed the old Tejero Bridge in Tanza Cavite for repairs.
A portion of Aurora Blvd. will be closed to traffic until Feb 1, 2020.
The Skyway will resume construction on the Extension Project, which will close certain lanes and toll plazas in the Alabang area.